[1]
Pasaribu, F., Mudaryoto , J.W. and Pasaribu, R.H. 2026. Pipe Stress Analysis of the Steam Pipe of Project Tidore Power Plant (2 X 4 MW) Using CAESAR II . Recent in Engineering Science and Technology. 4, 01 (Jan. 2026), 22–37. DOI:https://doi.org/10.59511/riestech.v4i01.129.